Home
Service
Drain Pit & Burn Pit
Drain Pit & Burn Pit
Precision excavation, backfilling, compaction, and slope construction for drain pits and burn pits at Saudi Aramco well pad locations — executed strictly per approved drawings and Aramco measurements.
Full scope execution from initial excavation through final compaction, compliant with Saudi Aramco Engineering Standards and site-specific scope of drawings.
Service Overview
ARAMCO-GRADE PIT CONSTRUCTION
AMGKSAGlobal delivers complete drain pit and burn pit construction services for Saudi Aramco well pad sites. Our certified crews execute every phase — from excavation per approved drawings to final compaction — with zero deviation from Aramco specifications.
With heavy excavation equipment, road rollers, and in-house qualified operators, we eliminate sub-contracting risk and maintain full on-site accountability from initial mobilization through slope construction and layer compaction testing.

What We Cover
Core Capabilities
Excavation & Backfilling
Excavation for drain pit construction per approved drawings near the well pad, with sand and marl backfilling to Aramco-required measurements and dimensional compliance.
Compaction Construction
Road roller compaction of the drain pit area after backfill, followed by precise slope construction at angles assigned per Saudi Aramco standards and layer compaction testing.
Burn Pit Execution
Full burn pit construction per Aramco scope drawings, with correct positioning relative to well pad infrastructure and strict compliance with site safety and dimensional requirements.
QA/QC & Documentation
Daily inspections, layer compaction test records, Aramco standards compliance reporting, and full QA/QC documentation package prepared and submitted at project handover.
Full Scope of Work
Everything We Deliver On Site
Drain Pit Excavation
Excavation for drain pit construction per scope of drawings and measurements required by Saudi Aramco, positioned correctly near the well pad with precise dimensional compliance.
Sand & Marl Backfilling
Backfilling of the well pad by placing sand and marl around the drain pit as per measurements required by Aramco — ensuring structural integrity and correct fill levels.
Compaction of Drain Pit Area
Post-backfill compaction of the drain pit area using road roller equipment, executed to meet Aramco compaction requirements and layer compaction test standards.
Slope Construction Inside Drain Pit
Construction of slope inside the drain pit at the angle assigned per Saudi Aramco standards, with compaction performed in layers per testing protocol.
Let’s talk about how we stand No. 01 position in the world!
How We Works
We constructed a secure
experience for you
Every AMGKSA project follows a structured, transparent process from your first enquiry to final documentation and handover
Enquiry & scope review
Project scope, location, and Aramco compliance needs reviewed within 24 hours
Construction & QA/QC
GPS and total station pre-construction survey by our certified surveyors
Proposal & quotation
Detailed scope, equipment plan, manpower, timeline and cost estimate
Mobilization & permits
Daily inspections, progress reporting, Aramco standards compliance
Project Gallery
See Our Work On The Ground
Aramco Access Road
Drain Pit Excavation
Site Preparation

