Home

Service

Drain Pit & Burn Pit

Drain Pit & Burn Pit


Precision excavation, backfilling, compaction, and slope construction for drain pits and burn pits at Saudi Aramco well pad locations — executed strictly per approved drawings and Aramco measurements.

Full scope execution from initial excavation through final compaction, compliant with Saudi Aramco Engineering Standards and site-specific scope of drawings.

Request a Proposal

Service Overview

ARAMCO-GRADE PIT CONSTRUCTION

AMGKSAGlobal delivers complete drain pit and burn pit construction services for Saudi Aramco well pad sites. Our certified crews execute every phase — from excavation per approved drawings to final compaction — with zero deviation from Aramco specifications.
With heavy excavation equipment, road rollers, and in-house qualified operators, we eliminate sub-contracting risk and maintain full on-site accountability from initial mobilization through slope construction and layer compaction testing.

  • Excavation per Aramco-approved scope drawings and measurements
  • Sand and marl backfilling to Aramco-required dimensions
  • Slope construction at specified angle per Aramco standards
  • Road roller compaction with layer compaction testing
  • No sub-contracting — 100% in-house execution

What We Cover

Core Capabilities

Excavation & Backfilling

Excavation for drain pit construction per approved drawings near the well pad, with sand and marl backfilling to Aramco-required measurements and dimensional compliance.

Compaction Construction

Road roller compaction of the drain pit area after backfill, followed by precise slope construction at angles assigned per Saudi Aramco standards and layer compaction testing.

Burn Pit Execution

Full burn pit construction per Aramco scope drawings, with correct positioning relative to well pad infrastructure and strict compliance with site safety and dimensional requirements.

QA/QC & Documentation

Daily inspections, layer compaction test records, Aramco standards compliance reporting, and full QA/QC documentation package prepared and submitted at project handover.


Full Scope of Work

Everything We Deliver On Site

01

Drain Pit Excavation

Excavation for drain pit construction per scope of drawings and measurements required by Saudi Aramco, positioned correctly near the well pad with precise dimensional compliance.

02

Sand & Marl Backfilling

Backfilling of the well pad by placing sand and marl around the drain pit as per measurements required by Aramco — ensuring structural integrity and correct fill levels.

03

Compaction of Drain Pit Area

Post-backfill compaction of the drain pit area using road roller equipment, executed to meet Aramco compaction requirements and layer compaction test standards.

04

Slope Construction Inside Drain Pit

Construction of slope inside the drain pit at the angle assigned per Saudi Aramco standards, with compaction performed in layers per testing protocol.

Let’s talk about how we stand No. 01 position in the world!

Read More

How We Works

We constructed a secure
experience for you


Every AMGKSA project follows a structured, transparent process from your first enquiry to final documentation and handover

Enquiry & scope review

Project scope, location, and Aramco compliance needs reviewed within 24 hours

Construction & QA/QC

GPS and total station pre-construction survey by our certified surveyors

Proposal & quotation

Detailed scope, equipment plan, manpower, timeline and cost estimate

Mobilization & permits

Daily inspections, progress reporting, Aramco standards compliance


Project Gallery

See Our Work On The Ground